Scale:
line
Line

Export PNG  












For ‘between’ operator, enter a range of lengths (e.g. 0-50)







For ‘between’ operator, enter a range of project costs in INR cr. (e.g. 0-50)





End of concession/contract period
To

Physical Progress Gap(%)



Workfront unavailable(%)

Length Completed(%)

Length Completed as % of total









3A Pending(%)

3A Pending

3G Pending

Pending Disbursement

Possession as share of Pvt. land(%)

Possession as share of Total Land(%)




No. of toll plazas

Average traffic at Plaza

Toll Collection

Average Survey traffic at Plaza


Slow Progress
Slow Mobilization
Low Work front
Completion Issues
Tollplaza
Traffic Survey